In actionHow it worksContextProjectPlanPartnershipTeamRequest information

Energy storage for Ukraine

We are building a battery in western Ukraine that helps the grid through the hardest hours of the day and earns on the price difference.

An energy storage facility that earns on Ukraine’s peak hours

A 1.5 MW / 5 MWh energy storage facility in western Ukraine buys electricity when it is cheap, sells it when the grid is stretched, and helps keep the lights on.

00:00Hold
Price€0
Battery0%
Margin today€0

Drag the slider or the scene to explore the day. Illustrative, not a forecast.

Buy low, sell high

Charge

When electricity is cheap, the battery takes energy from the grid.

Hold

Automated control watches prices. If the gap isn’t worth it, the system doesn’t trade.

Deliver

In the morning and evening, when demand peaks, the energy goes back to the grid.

Why Ukraine needs storage now

About half of Ukrenergo’s high-voltage substations have been damaged, and roughly 8.5 GW of thermal and hydro generation is lost or damaged. Fast, local capacity is what the grid is missing.

~10 GWestimated capacity shortfall; imports cannot fully cover it (Reuters, 2026)
$588bnrecovery needs; rebuilding energy takes 10+ years (World Bank, 2026)
Highrisk of winter peak shortages, rated by the IEA

What each battery does for the grid

  • Stabilises the grid and eases peak-hour load
  • Helps integrate solar and wind generation
  • Reduces reliance on emergency electricity imports
  • Strengthens local energy security and builds infrastructure for recovery

The IEA and EBRD name energy storage a key tool for the resilience of Ukraine’s power system.

The project in brief

A standalone battery that earns on price differences between hours of the day.

The core income is price arbitrage on the day-ahead market. Further potential lies in the intraday and balancing markets, ancillary services, reserves and cooperation with renewable producers and aggregators.

The logic was tested on official hourly prices for January–July 2026. The financial model and scenarios are available on request.

Power / storage1.5 MW / 5 MWh
Usable per cycle≈ 4.5 MWh
Round-trip efficiency90%
Operationup to 2 cycles/day
ControlEMS & SCADA
Loss-making tradesavoided by design

From plan to power in 9 months

A preliminary cooperation agreement is in place with the Kholmok Territorial Community, Uzhhorod District. The final site is chosen after technical and legal review, and grid capacity is confirmed before the investment decision.

Participation and investor protection

The project is funded by a combination of investor equity and bank debt. Terms are tailored to each partner.

Equity

The investor takes an ownership stake in the project company.

Loan

A shareholder or project loan on agreed terms.

Preferred

Blended

Equity plus debt, our preferred starting point.

How we protect the investor

  • Separate project company and bank account; rights and licences registered to it
  • Staged funding against milestones
  • Approval rights on key matters, financial reporting, independent audit
  • Supplier warranties, insurance, possible pledge of equipment

Key risks and our answer

Market spread

Conservative benchmark, flexible dispatch, no forced loss-making cycles.

Grid connection

Technical site review and written confirmation before approval.

Cost overrun

Fixed offers, competitive procurement, staged payments, contingency.

War and physical damage

Site selection, physical protection, decentralised format, insurance.

Technology and degradation

Bankable supplier, capacity and cycle warranties, service agreement.

In a downside case, equipment may be sold to recover capital in part or in full, depending on market value. Full recovery is not guaranteed.

The people behind it

YK

Yurii Kotubei

Legal structuring and project development

Corporate lawyer with about nine years of experience. Before the full-scale war he supported the launch of several solar plants in western Ukraine totalling over 20 MW: company formation, licensing, grid connection, contracts and bank financing.

YK

Yulian Kritsak

Project management and partner coordination

Programme coordinator with about ten years across the public and private sectors. He has led infrastructure and institutional projects worth over UAH 300 million, managing budgets, contractors, timelines and work with local authorities.

This is only the first step

Operate

Run the first BESS and prove results.

Replicate

More sites, local assembly and service.

Close the loop

Diagnostics, second-life use and recycling.

Manufacture

Batteries and equipment from recovered materials.

Each new line needs its own feasibility study, partners, permits and capital, and none is part of the first BESS case.

Let’s talk

We will send the financial model, technical details and participation terms. Next: confirm interest, sign an NDA, agree a short term sheet.

Yurii Kotubei
Legal and developmentyurii.kotubei@3half.org+380 66 005 9008
Yulian Kritsak
Project management and partnersyulian.kritsak@3half.org+380 97 194 1412

This opens your email app with the message ready to send to both of us.

Request information